Rapid shutdown compliance keeps failing inspection on one specific inverter combo Commissioning
Residential, string inverter with module-level rapid shutdown devices. Third inspection failure on this combination and the AHJ is now looking at all my permits sideways.
Failure mode: inspector initiates rapid shutdown, measures at the combiner, and reads voltage that takes about 45 seconds to drop below 30V. Code requires it within 30 seconds.
The RSD devices are listed, the inverter is listed, both are on the manufacturer's compatibility matrix.
Everything is installed per the instructions. Why is it slow?