Ground mount on expansive clay — two years of movement and what I would do differently Design
24kW ground mount, driven pier foundation, installed two years ago on a site with expansive clay that I did not adequately account for.
What happened: seasonal movement of roughly an inch and a half of heave and settlement across the array. Not uniform — the north rows moved more than the south. Two years in, module clamps have loosened on about a dozen modules and one rail joint has a visible gap.
Nothing has failed and production is normal. But this array is going to need attention every few years for its whole life and it should not.
What I would do differently:
Get a geotech report. I skipped it because it was a residential ground mount and the cost felt disproportionate. It was maybe $1,800. The remediation is going to cost more than that.
Drive deeper than the frost line. Frost depth is the number everybody uses and on expansive clay it is the wrong number entirely. Active zone depth for moisture change is what matters and it can be substantially deeper.
Helical piers, not driven. Helicals resist uplift, which is the direction clay heave actually pushes.
Allow for differential movement in the racking. Slip joints at rail splices instead of rigid connections.
Posting this because ground mounts get treated as the easy version of solar and the foundation is a real engineering problem that I treated as a detail.