Testing season is on and every year I watch newer testers make the same handful of mistakes. Here is what my process looks like now.
Before you touch the device
- Photograph the tag and the nameplate first. Every time. Wrong serial on a report is a failed submittal and a return trip.
- Note the installation orientation. A RPZ installed vertically that is only listed horizontal fails on install, not on test, and you want that in your notes before you start.
- Check for a downstream shutoff. No shutoff means no test, and finding that out after you have set up your gauge is a wasted forty minutes.
Setup
- Bleed every hose. Air in a test hose reads as a passing differential on a device that should fail.
- Zero the gauge at the working position, not on the tailgate.
- If it is a five-valve gauge, know which of your hoses is high side by color and never rely on memory.
During
- Let the readings settle. A relief valve that is slowly weeping looks stable for the first ten seconds.
- Record what you saw, not what you expected. If number two check reads 1.2 PSID, write 1.2, not "pass."
After
- Return the shutoffs to their original position and verify — leaving a building's water off is the fastest way to become memorable for the wrong reason.
- File same day. Every jurisdiction I work in has a deadline and none of them are generous about it.
What is on yours that is not on mine?