Cast iron stack replacement in an occupied 1920s four-flat — sequencing question Install
Four-story walkup, single 4 inch cast stack serving four units, original 1926 pipe, failing at the hub joints on the second floor. Owner wants it replaced. Tenants stay in place.
Plan is to open the chase floor by floor, replace with no-hub cast (not PVC — the owner cares about noise and I agree with him), and reconnect each floor's branches as I go.
The part I am still turning over is water service continuity. Every unit loses drainage while its floor is open. Best case that is one day per floor.
Anyone done this occupied? How did you handle the tenant side of it, and did you work top down or bottom up?